Supreme Infrastructure India company was incorporated under Indian Companies Act 1956 as Supreme Asphalts Private Limited and was promoted by Bhawanishankar H Sharma along with other promoters in the year 1983. Subsequently, the company changed its name to Supreme Infrastructure India Private Limited in 2002. It became a public limited company by the name Supreme Infrastructure India Limited in 2007.
Supreme Infrastructure India is one of the promising companies in India having turnover of Rs 1400 million. The company has been formed to undertake engineering works of unrestricted value with most of the government departments, public & private sector organisations. It is a tribute to the company’s outstanding performance that national & international contractors have expressed their interests for partnership on equal footing for mega size projects.
Apart from the latest methods and techniques, the company has introduced automation in its working styles. Use of QA / QC methods, Project Management & Control Tools, Safety Manuals, is the hallmark of company’s operations. As an organisation, it is always on the move to improve its productivity further by resorting to new management of tools as they become available.
The company does not rest on the laurels and continues to endeavour towards the future progress & development to reach the peaks of the engineering professions viz, Excellence, Expediency and Economy. And, by doing this, it is proud to say that it can carry out the construction works in keeping with these three E's.
Projects undertaken:
Some of the major infrastructure development projects executed by Supreme Infrastructure are as follows:
- Bandra-Worli Sea Link Project (Road Part as Sub-contractor)
- Widening and construction of Western Express Highway from Andheri Flyover to JVLR Junction (Km 518.60 to 516.40) Mumbai under Mumbai Metropolitan Region Development Authority, Mumbai.
- Improvements to Nagpur Aurangabad Sinnar Ghoti Mumbai Road to NH Standard Package- III A – Talegaon Shinganapur 31.93 km under Maharashtra Road Development Corporation Limited.
- Construction of Pavement Quality Concrete for road between Anik Wadala Link Road from Ganesh Nagar to Bhakti Park for Municipal Corporation of Greater Mumbai.
- Widening and construction of Western Express Highway from Airport Junction to Andheri Flyover (Km 521.300 to 518.600) Mumbai under Mumbai Metropolitan Region Development Authority, Mumbai.
- Construction of flexible pavement for Public Works Department including construction of minor bridges:-Construction of flexible pavement for Public Works Department Maharashtra State -Construction of Pavement Quality Concrete Road for Mumbai Port Trust, Mumbai (This work PQC of 5838 CUM was achieved in record time of 4months) -Construction of Flexible Pavement for Mumbai Port Trust
- Pavement Quality Concrete M-35 for Municipal Corporation of Greater Mumbai.
- Earth work & construction of CC nallah, minor bridges, drain and boundary wall for Central Railway expansion of two more tracks, Mumbai. The work consists of Excavation in soil, Rock, CC Drain, Retaining wall, UCR Boundary wall etc.
- Strengthening of Sea Wall and Laying of Tetra Pods along the Sea Wall at Mumbai under Public Works Department, Mumbai.
Ongoing projects
- Contract for Nallah Development Works at Thane by TMC
- Contract for Construction of RCC Buildings on MMRDA plot at Thane
- Construction of IT Park, Service Apartments, Residential Towers for Supreme Housing & Hospitality Pvt.Ltd
- Construction of Residential Tower at Powai
Clientele:
- National Highway Authority of India (NHAI)
- Mumbai Metropolitan Region Development Authority (MMRDA)
- Maharashtra Road Development Corporation Limited (MSRDC)
- Public Works Department (PWD)
- Maharashtra Public Works Department
- Municipal Corporation of Greater Mumbai (MCGM)
- Mumbai Port Trust (MBPT)
- Mumbai Transport Project (Railway)
- Airports Authority of India (AAI)
- Bombay Municipal Corporation (BMC)
- Rashtriya Chemical Fertilizer (RCF)
- Hiranandani Constructions
- K. Raheja
- Pratibha Industries Limited
- Bhaba Automic Research Centre (BARC)
- Military Engineering Services (MES)
- Thane Municipal Corporation
- Sadbhav Engineering Limited
Milestones:
- 1983- Year of company's incorporation
- 2002-First contract for Road & Bridges in Amravati by MSRDC
- 2003- First RMC Plant at Powai, Mumbai
- 2004- Construction & widening of Western Express Highway by MMRDA
- 2005- Contract of PDE (Costal) for Strengthening of Sea-wall & Laying of Tetra Pods along Sea-wall
- 2006- Contract for Four Lanning of Bhiwandi-Nasik Highway (NH-3), Contract from Sadbhav Engg.Limited Established Quarrying & Crushing, RMC, Paver Block Units at Padgha on Mumbai Nasik Highway
- 2007 Contract for Rehabilitation & upgrading of Chitradurga Section (Km.189 to Km.207) Balance Works (NH-4) from NHAI (Rs.1004 million)